Admin Welcomes U ANNA UNIVERSITY QUESTION BANKS PAPERS WITH SOLUTIONS: EEE SIXTH

JOIN WITH US :)

WELCOME TO GEEKERS UNIVERSITY OF STUDENT AND PROFESSORS OFFCIAL WEBSITE

THIS WEBSITE BELONGS TO STUDENTS AND PROFESSORS OF GEEKERS UNIVERSITY

GEEKERS UNIVERSITY DEPT

RESEARCH,MBBS,NURSING,ENGINEERING,ARTS AND SCIENCE,TECHNOLGY,DIPLOMA,PLUSTWO,TENTH STANDARD AND SCHOOLS :)

RESULTS

ALL RESULTS,EXAM DATES ,TIME TABLE,ETC

GEEKERS UNIVERSITY

PROJECTS,PAPER PRESENTATION SEMINARS,TUTORIALS,HOW TO,OTHERS,HACKING,MINI PROJECTS

GEEKERS UNIVERSITY---- GAMES

PUZZ,QUIZ,MEDIA,SPORTS,EBOOKS,TUTORIALS,FUN EXAMS,LEARNING,ONLINE TESTING YOUR MIND SPEED,CHATTING AND MUCH MORE


If any add appear like this please click skip add

Category

INFO

CLICK HERE
FOR LATEST RESULTS
LATEST NEW TIME TABLE/EXAM DATES FOR ALL LINK1 LINK2
ANNA UNIVERSITY COLLEGES RANK LIST 2012 CHECK SOON
LATEST FREE PLACEMENT PAPERS FOR ALL COMPANIES CHECK SOON
GET FREE MINI PROJECTS AND FINAL YEAR PROJECTS CLICK HERE
LATEST HOT HACKING TRICKS CLICK HERE

LATEST QUESTION BANKS /PAPERS/entrance FOR ALL EXAMS CLICK HERE link1 link2




our sites
www.tricksnew.blogspot.com www.questionbank.tk
www.freeminiproject.blogspot.com and
www.onlineinfocity.
blogspot.com


NOTE:

FEEL FREE TO CONTACT US click on me
DONT FORGET TO SUBSCRIBE YOUR MAIL ID ----->>>TO GET DAILY question banks IN YOUR INBOX::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: SEE RIGHT SIDE CORNER
Showing posts with label EEE SIXTH. Show all posts
Showing posts with label EEE SIXTH. Show all posts

Friday, May 11, 2012

Computer Networks(CN) Anna university subject notes lecturer notes unit wise unit 1,unit 2 unit 3 unit 4 unit 5 for cse eee ece


Computer Networks(CN) Anna university subject notes lecturer notes unit wise unit 1,unit 2 unit 3 unit 4 unit 5 for cse eee ece

all units notes 1 click here to download 







others question papers for computer networks

 click here  


Anna University
B.E./B.Tech. DEGREE EXAMINATION
NOVEMBER/DECEMBER 2011.
Sixth Semester
Electrical and Electronics Engineering
CS 2363 — COMPUTER NETWORKS
(Regulation 2008)

Time : Three hours
Maximum : 100 marks
Answer ALL questions.

PART A — (10 × 2 = 20 marks)
1. Define a computer network.
2. What is FDDI?
3. What is internet working?
4. What is IPV6?
5. What is queuing?
6. Define congestion.
7. Define cryptography.
8. What is PGP.
9. What is HTTP?
10. List multimedia applications.

PART B — (5 × 16 = 80 marks)
11. (a) (i) Describe network architecture in detail. (8) (ii) What is Ethernet? Explain in detail. (8)
Or
(b) (i) What is error detection? Explain with examples. (8) (ii) Write a note on bridges. (8)
12. (a) (i) Explain in detail about internet control message protocol. (8) (ii) Describe any one routing algorithm. (8)
Or
(b) (i) What is dynamic host configuration protocol? Explain in detail. (8)
(ii) Write a note on addressing. (8)
13. (a) (i) Explain the user datagram protocol (UDP) in detail. (8) (ii) What is flow control? Explain in detail. (8)
Or
(b) (i) Explain in detail the transmission control protocol. (8) (ii) Write a note on congestion avoidance mechanisms. (8)
14. (a) (i) Write a note on JPEG, MPEG and MP3. (8) (ii) What is IP security? Explain in detail. (8)
Or
(b) (i) Explain fire walls in detail. (8)
(ii) Explain the basic principles of authentication. (8)
15. (a) (i) Describe domain name system in detail. (8) (ii) Write a note on e-mail. (8)
Or
(b) (i) Explain simple network management protocol in detail. (8) (ii) Describe in detail the file transfer protocol (FTP). (8)









spl thanks to Ms Sasikala Rajendran :)

anna university eee sixth semester question banks/papers updated

anna university eee sixth semester question banks/papers updated



Download


Adobe Acrobat Document [2.7 MB]
Download






  • DESIGN OF ELECTRICAL MACHINES Question Banks/Quest...



  • Download


    Adobe Acrobat Document [2.7 MB]
    Download



  • HIGH VOLTAGE ENGINEERING (HVE) question banks/pape...



  • Download


    Adobe Acrobat Document [2.7 MB]
    Download



  • question banks SOLID STATE DRIVES (SSD)–April / Ma...



  • Download


    Adobe Acrobat Document [2.7 MB]
    Download



  • EE339 - POWER SYSTEM ANALYSIS question banks

  • Download


    Adobe Acrobat Document [2.7 MB]
    Download



    Download


    Adobe Acrobat Document [2.7 MB]
    Download


    http://annaunivquestionbanks.blogspot.com/2012/05/computer-networkscn-anna-university.html
    anna university question bank for eee, EEE, EEE SIXTH, QUESTION BANKS, Anna University Chennai Question Bank,


    Thursday, May 10, 2012

    DESIGN OF ELECTRICAL MACHINES Question Banks/Question papers/eee sixth semester


    DESIGN OF ELECTRICAL MACHINES Question Banks/Question papers/eee sixth semester
    B.E./B.Tech. DEGREE EXAMINATION, APRIL/MAY 2011
    Sixth Semester
    EE 2355 — DESIGN OF ELECTRICAL MACHINES APRIL/MAY 2011
    (Regulation 2008)



    DESIGN OF ELECTRICAL MACHINES (DEM)–Nov / Dec 2011 Question Paper
    Anna University
    B.E./B.Tech. DEGREE EXAMINATION
    NOVEMBER/DECEMBER 2011.
    Sixth Semester
    EE 2355 — DESIGN OF ELECTRICAL MACHINES NOVEMBER/DECEMBER 2011.

    (Regulation 2008)


    eee sixth semester notes+question papers+question banks free download

    HIGH VOLTAGE ENGINEERING (HVE) question banks/papers

    HIGH VOLTAGE ENGINEERING (HVE)–Nov / Dec 2011 Question Paper




    ALL DEPT, anna university question bank for eee, EEE, EEE SIXTH,HIGH VOLTAGE ENGINEERING(HVE), QUESTION BANKS, 





    EE 2353 — HIGH VOLTAGE ENGINEERING NOVEMBER/DECEMBER 2011.





    Anna University

    B.E./B.Tech. DEGREE EXAMINATION, APRIL/MAY 2011
    Sixth Semester
    Electrical and Electronics Engineering
    EE 2353 — HIGH VOLTAGE ENGINEERING APRIL/MAY 2011

    (Regulation 2008)

    EE 2353 HIGH VOLTAGE ENGINEERING

    Download
    APRIL/MAY 2008
    EE 2353 HIGH VOLTAGE ENGINEERING

    Adobe Acrobat Document [2.7 MB]
    Download



    EE 1402 HIGH VOLTAGE ENGINEERING

    Download
    APRIL/MAY 2008
    EE 1402 HIGH VOLTAGE ENGINEERING
    EE 1402 - MAY - 08.pdf
    Adobe Acrobat Document [2.7 MB]
    Download
    EE 2353 — HIGH VOLTAGE ENGINEERING NOVEMBER/DECEMBER 2011.



    Anna University
    B.E./B.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2011.
    Sixth Semester
    Electrical and Electronics Engineering
    EE 2353 — HIGH VOLTAGE ENGINEERING NOVEMBER/DECEMBER 2011.

    (Regulation 2008)

    eee sixth semester notes+question papers+question banks free download

    question banks SOLID STATE DRIVES (SSD)–April / May 2011 Question Paper

    anna university question bank for eee|EE 2352 — SOLID STATE DRIVES PRIL/MAY 2011
    SOLID STATE DRIVES (SSD)–April / May 2011 Question Paper


    SOLID STATE DRIVES (SSD)–April / May 2011 Question Paper

    ALL DEPT,  anna university question bank for eee , EEE, EEE SIXTH, POWER SYSTEM ANALYSIS, QUESTION BANKS,

    Anna University
    B.E./B.Tech. DEGREE EXAMINATION, APRIL/MAY 2011
    Sixth Semester
    EE 2352 — SOLID STATE DRIVES PRIL/MAY 2011
    (Regulation 2008)

    Time : Three hours
    Maximum : 100 marks
    Answer ALL questions

    PART A — (10 × 2 = 20 marks)
    1. What are the types of load torques?
    2. Write down the fundamental torque equation of motor load system?
    3. List out the drawbacks of ac-dc converter fed dc drive.
    4. What is TRC scheme?
    5. Write the transfer function of converter.
    6. Write the real and reactive power equations of a balanced 3 phase ac system.
    7. What are the various applications of stator voltage control scheme?
    8. Give the advantages of vector control method.
    9. What is the necessity of delay unit in a open loop v/f control of synchronous motor?
    10. Define self control of synchronous motor.

    PART B — (5 × 16 = 80 marks)
    11. (a) Explain in detail the multi quadrant operation of low speed hoist in speed torque plane. (16)
    Or
    (b) A motor drives two loads. One has rotational motion. It is coupled to themotor through a reduction gear with a = 0.1 and efficiency of 90%. The load has a moment of inertia of 10 kg-m2 and a torque of 10 N-m. Other load has translational motion and consists of 1000kg weight to be lifted up at a uniform speed of 1.5 m/s. coupling between this load and the motor has an efficiency of 85%. Motor has inertia of 0.2 kg-m2 and runs at a constant speed of 1420 rpm. Determine equivalent inertia referred to the motor shaft and power developed by the motor. (16)
    12. (a) Explain the operation of single phase fully-controlled converter fed dc separately excited motor in continuous and discontinuous modes of operation with necessary waveforms and steady state analysis. (16)
    Or
    (b) (i) Explain the different control techniques of chopper in detail. (8) (ii) Discuss the four quadrant operation of DC-DC converter. (8)
    13. (a) Explain the closed loop operation of armature voltage control method with field weakening mode control in detail. (16)
    Or
    (b) Explain the design procedure of current controller in detail. (16)
    14. (a) Explain the theory of v/f control in detail. (16) Or
    (b) Explain the principle of vector control in detail with block diagram. (16)
    15. (a) (i) Explain the open loop v/f control of synchronous motor in detail. (8)
    (ii) Explain the concept of self controlled synchronous motor drive. (8)
    Or
    (b) Explain the construction and working of permanent magnet synchronous motor. (16)


    All the best

    uploaded by Mr Arun M.E


    eee sixth semester notes+question papers+question banks free download

    EE339 - POWER SYSTEM ANALYSIS question banks


    click here to download  B.E. ELECTRICAL AND ELECTRONICS ENGINEERING
    EE339 - POWER SYSTEM ANALYSIS



    Anna University
    B.E./B.Tech. DEGREE EXAMINATION, APRIL/MAY 2011
    Sixth Semester
    EE 2351 — POWER SYSTEM ANALYSIS (Regulation 2008)


    Time : Three hours
    Maximum : 100 marks
    Answer ALL questions


    PART A — (10 × 2 = 20 marks)
    1. Draw a simple per-phase model for a cylindrical rotor synchronous machine.
    2. What are the advantages of per unit system?
    3. What is Jacobian matrix?
    4. What is a slack bus?
    5. Mention the objectives of short circuit analysis.
    6. Write down the balanced and unbalanced faults occurring in a power system.
    7. What is sequence network?
    8. Write the symmetrical components of a three phase system?
    9. Define critical clearing angle.
    10. Write swing equation.


    PART B — (5 × 16 = 80 marks)
    11. (a) (i) With the help of single line diagram, explain the basic components of a power system. (8)
    (ii) Write detailed notes about the per-phase model of a three phase transformer. (8)
    Or
    (b) Draw the impedance diagram for the electric power system shown in figure 11 (b) showing all impedance in per unit on a 100-MVA base. Choose 20-kV as the voltage base for generator. The three-phase power and line-line ratings are given below. (16)
    G1 : 90 MVA 20 kV X = 9%
    T1 : 80 MVA 20/200 kV X = 16% T2 : 80 MVA 200/20kV X = 20% G2 : 90 MVA 18 kV X = 9%
    Line : 200 kV X = 120
    Load : 200 kV, S = 48 MW + j64Mvar
    Fig. 11. (b)
    12. (a) With neat flow chart explain the computational procedure for load flow solution using fast decoupled method when the system contains all types of buses. (16)
    Or
    (b) Explain the step by step computational procedure for the Gauss-Seidel method of load flow studies. (16)
    13. (a) Explain symmetrical fault analysis using Z-bus matrix with neat flow chart. (16)
    Or
    (b) A 11 kV, 100 MVA alternator having a sub-transient reactance of 0.25 pu is supplying a 50 MVA motor having a sub-transient reactance of 0.2 pu through a transmission line. The line reactance is 0.05 pu on a base of 100 MVA. The motor is drawing 40 MW at 0.8 p.f. leading with a terminal voltage of 10.95 kV when a 3-phase fault occurs at the generator terminals. Calculate the total current in generator and motor under fault conditions. (16)
    14. (a) What are the assumptions to be made in short circuit studies? Deduce and thaw the sequence network for a line to line fault at the terminals of an unloaded generator. (16)
    Or
    (b) Two 11 kV, 20 MVA, three phase, star connected generators operate in parallel as shown in Figure 14. (b) ; the positive, negative and zero sequence reactance’s of each being, respectively, j0.l8, j0.15, j0.10 pu. The star point of one of the generators is isolated and that of the other is earthed through a 2.0 ohms resistor. A single line to ground fault occurs at the terminals of one of the generators. Estimate
    (i) the fault current,
    (ii) current in grounding resistor, and
    (iii) the voltage across grounding resistor. (16) Fig. 14. (b)
    15. (a) Describe the Runge-Kutta method of solution of swing equation for multi-machine systems. (16)
    Or
    (b) Derive an expression for the critical clearing angle and clearing time. (16)

    Anna Univeristy
    B.E./B.Tech. DEGREE EXAMINATION
    NOVEMBER/DECEMBER 2011.
    Sixth Semester
    Electrical and Electronics Engineering 

    EE 2351 — POWER SYSTEM ANALYSIS
    (Regulation 2008)

    Time : Three hours Maximum : 100 marks
    Answer ALL questions.

    PART A — (10 × 2 = 20 marks)
    1. What is single line diagram?
    2. How are the loads represented in reactance or impedance diagram?
    3. What are the different types of buses in power systems? What are the quantities specified in each bus?
    4. How are the disadvantages of Newton–Raphson method overcome?
    5. What is the need for short circuit studies?
    6. List the various types of shunt and series faults.
    7. Define negative sequence impedance.
    8. Name the faults which do not have zero sequence currents flowing.
    9. Give an expression for swing equation. Explain each term along with their units.
    10. State equal area criterion.





    B.E./B.Tech. DEGREE EXAMINATION,APRIL/MAY 2010
    VI - SEMESTER
    B.E. ELECTRICAL AND ELECTRONICS ENGINEERING
    EE339 - POWER SYSTEM ANALYSIS
    Time: 3hrs Max Marks: 100
    Answer all Questions
    PART – A (10 x 2 = 20 Marks)

    1. What is the need for system analysis in planning and operation of power system?

    2. How are the base values chosen in per unit representation of a power system?

    3. Draw the  equivalent circuit of a transformer with off-nominal tap ratio and admittance .

    4. Define bus incidence matrix.

    5. Mention two objectives of short circuit analysis.

    6. Draw the zero sequence network of a star connected generator with zero sequence impedance Zgo when the neutral is grounded through an impedance Zn.

    7. What are the three classes of buses of a power system used in power flow analysis? What are the quantities to be specified and to be computed for each class during power flow solution?

    8. Compare Gauss-Seidel method and Newton – Raphson method with respect to
    number of iterations taken for convergence and memory requirement.

    9. Define critical clearing time.
    10. Write the power-angle equation of a synchronous machine connected to an infinite bus and also the expression for maximum power transferable to the bus.

    PART B (5 x 16 = 80 Marks)

    11. Obtain the per unit impedance (reactance) diagram of the power system

    Generator No.1: 20 MVA, 10.5 KV, X'' = 1.4 ohms, Xn1= 0.5 ohm
    Generator No.2: 10 MVA, 6.6 KV, X"= 1.2 ohms, Xn2 = 0.5 ohm
    Transformer T1 (3 phase): 10 MVA, 33/11 kV, X = 15.2 ohms per phase on high tension side.
    Transformer T2 (3 phase) : 10 MVA, 33/6.2 kV, X= 16 ohms per phase on high tension side.
    Transmission line: 22.5 ohms / phase.
    Choose a common base of 20 MVA

    12.a) Determine Z bus using bus impedance matrix building algorithm by adding the lines as per increasing element number. The reactance diagram of the system is shown in
    (OR)

    12.b) Explain the modelling of Generator, Load and Transmission line for short circuit, power flow and stability studies.

    13.a) Derive the formula for fault current, fault-bus voltages and current through the lines for a 3 phase symmetrical fault at a bus in a power system using Z bus. State the assumptions made in the derivation.

    (OR)

    13.b) A single line to ground fault occurs on bus 4 of the system shown in Figure. Q.13(b)
    (i) Draw the sequence networks.

    Generator 1 & 2 : 100 MVA, 20kV with X1 = X2 = 20%, X0 = 4%, Xn = 5%
    Transformer 1 & 2 : 100 MVA, 20kV/345kV. X leakage = 8% on 100 MVA.
    Transmission line: X1 = X2 =15% and X0 =50% on a base of 100 MVA, 20kV

    14.a) Explain clearly the algorithmic steps for solving load flow equations using Newton – Raphson method (polar form) when the system contains all types of buses. Assume that the generators at the P-V buses have enormous Q limits and hence Q limits need not be checked.

    (OR)

    14.b) The system data for a load flow problem are given in Table 1 and Table 2.
    (i) Compute Y bus
    (ii) Determine bus voltages at the end of 1st iteration by Gauss-Seidel method. Take acceleration factor as 1.6.

    Bus Code of Lines Admittance (p.u)
    1-2 2-j8
    1-3 1-j4
    2-3 0.6-j2.6

    TABLE – 1 Line Data

    Bud Code P Demand in p.u Q Demand in p.u V, p.u Remarks
    1 - - 1.06?0 Slack
    2 0.5 0.2 - PQ
    3 0.4 0.3 - PQ

    TABLE – 2 Bus Data

    15.a)i) Write the swing equation describing the rotor dynamics of a synchronous machine connected to infinite bus through a double circuit transmission line.

    ii) Explain the step-wise procedure of determining the swing curve of the above system using Modified Euler's method.

    (OR)

    15.b) In the system shown in Fig, Q. 15(b) a 3 phase fault occurs at point P closer to bus 2.

    Find the critical clearing angle for clearing the fault with simultaneous opening of the breakers 1 & 2. The reactance values of the various components are Xg = 0.15 p.u Xtr=0.1 p.u, XL1 = 0.5 p.u, XL2 = 0.4 p.u. The generator is delivering 1.0 p.u power at the instant preceding the fault.


    Anna University
    B.E./B.Tech. DEGREE EXAMINATION, APRIL/MAY 2011
    Sixth Semester
    EE 2351 — POWER SYSTEM ANALYSIS (Regulation 2008)


    Time : Three hours
    Maximum : 100 marks
    Answer ALL questions

    PART A — (10 × 2 = 20 marks)
    1. Draw a simple per-phase model for a cylindrical rotor synchronous machine.
    2. What are the advantages of per unit system?
    3. What is Jacobian matrix?
    4. What is a slack bus?
    5. Mention the objectives of short circuit analysis.
    6. Write down the balanced and unbalanced faults occurring in a power system.
    7. What is sequence network?
    8. Write the symmetrical components of a three phase system?
    9. Define critical clearing angle.
    10. Write swing equation.


    PART B — (5 × 16 = 80 marks)
    11. (a) (i) With the help of single line diagram, explain the basic components of a power system. (8)
    (ii) Write detailed notes about the per-phase model of a three phase transformer. (8)
    Or
    (b) Draw the impedance diagram for the electric power system shown in figure 11 (b) showing all impedance in per unit on a 100-MVA base. Choose 20-kV as the voltage base for generator. The three-phase power and line-line ratings are given below. (16)
    G1 : 90 MVA 20 kV X = 9%
    T1 : 80 MVA 20/200 kV X = 16% T2 : 80 MVA 200/20kV X = 20% G2 : 90 MVA 18 kV X = 9%
    Line : 200 kV X = 120
    Load : 200 kV, S = 48 MW + j64Mvar
    Fig. 11. (b)
    12. (a) With neat flow chart explain the computational procedure for load flow solution using fast decoupled method when the system contains all types of buses. (16)
    Or
    (b) Explain the step by step computational procedure for the Gauss-Seidel method of load flow studies. (16)
    13. (a) Explain symmetrical fault analysis using Z-bus matrix with neat flow chart. (16)
    Or
    (b) A 11 kV, 100 MVA alternator having a sub-transient reactance of 0.25 pu is supplying a 50 MVA motor having a sub-transient reactance of 0.2 pu through a transmission line. The line reactance is 0.05 pu on a base of 100 MVA. The motor is drawing 40 MW at 0.8 p.f. leading with a terminal voltage of 10.95 kV when a 3-phase fault occurs at the generator terminals. Calculate the total current in generator and motor under fault conditions. (16)
    14. (a) What are the assumptions to be made in short circuit studies? Deduce and thaw the sequence network for a line to line fault at the terminals of an unloaded generator. (16)
    Or
    (b) Two 11 kV, 20 MVA, three phase, star connected generators operate in parallel as shown in Figure 14. (b) ; the positive, negative and zero sequence reactance’s of each being, respectively, j0.l8, j0.15, j0.10 pu. The star point of one of the generators is isolated and that of the other is earthed through a 2.0 ohms resistor. A single line to ground fault occurs at the terminals of one of the generators. Estimate
    (i) the fault current,
    (ii) current in grounding resistor, and
    (iii) the voltage across grounding resistor. (16) Fig. 14. (b)
    15. (a) Describe the Runge-Kutta method of solution of swing equation for multi-machine systems. (16)
    Or
    (b) Derive an expression for the critical clearing angle and clearing time. (16)




    Anna Univeristy
    B.E./B.Tech. DEGREE EXAMINATION
    NOVEMBER/DECEMBER 2011.
    Sixth Semester
    EE 2351 — POWER SYSTEM ANALYSIS
    (Regulation 2008)


    Time : Three hours Maximum : 100 marks
    Answer ALL questions.

    PART A — (10 × 2 = 20 marks)
    1. What is single line diagram?
    2. How are the loads represented in reactance or impedance diagram?
    3. What are the different types of buses in power systems? What are the quantities specified in each bus?
    4. How are the disadvantages of Newton–Raphson method overcome?
    5. What is the need for short circuit studies?
    6. List the various types of shunt and series faults.
    7. Define negative sequence impedance.
    8. Name the faults which do not have zero sequence currents flowing.
    9. Give an expression for swing equation. Explain each term along with their units.
    10. State equal area criterion.

    12. (a) The one line diagram of three bus power system is shown in fig. Q.

                    
                               Fig. Q. 12 (a)
    Bus 1: Slack bus Especified = 1.05∠0°
    Bus 2: PV bus |E|specified = 1.2 pu., PG = 3 p.u.
      Bus 3: PQ bus, PL = 4 p.u. QL=2 p.u.
      Carry out one iteration of load flow solution by Gauss-Seidel method.
      Take Q limits of generator 2 as 0≤Q≤ 4. Take α =1.
                       Or
    (b) (i) Draw the flow chart of fast decoupled load flow method. (10)
           (ii) Briefly explain the importance of power flow analysis. (6)
    13. (a) Figure Q.13 (a) shows a generating station feeding a 132 KV system.
                  Determine the total fault current, fault level and fault current
                  supplied by each alternator for a 3-phase fault at the receiving end
                  bus. The line is 200 km long. Fig. Q. 13 (a) give below
                    Or
          


    14(b) A 30 MVA. 11 KV generator has ZI=Z2=j0.2 p.u, Z0=j0.05 p.u. A line to
    ground fault occurs on the generator terminals. Find the fault
    current and line to line voltages during limit conditions. Assume that
    the generator neutral is solidly grounded and that the generator is
    operating at no load and at rated voltage at the occurrence of fault. (16)
    15. (a) (i) A generator is operating at 50 Hz delivers 1 p.u. power to an
    infinite bus through a transmission circuit in which resistance
    is ignored. A fault takes place reducing the maximum power
    transferable to 0.5 p.u. whereas before the fault, this power was
    2.0 p.u. and after the clearance of the fault, it is 1.5 p.u. By the
    use of equal area criterion, determine the critical clearing angle.(10)
    (ii) Discuss the methods by which the transient stability can be
    improved. (6)
    Or
    (b) Derive the swing equation of a single machine connected to an
    infinite bus system and explain the steps of solution by Runge-Kutta
    method. (16)
    ————————

    chitika